Investigation and site remediation of the metallurgical plant Nickelhütte Aue GmbH. Historical survey, reconnaissance, detailed investigation and remediation planning for parts, technical construction supervision, flood protection, contaminated sites, pumping tests, groundwater flow models and groundwater monitoring.
ÖGP Leuna: remediation investigation for the former gravel pit and ist environment within the chemical plant Leuna.
Geophysical study, planning and supervision of measuring points for groundwater; sampling and analytics, pumping tests.
"Ecological flood protection along the Schwarzwasser in the city of Aue"
Beak Consultants GmbH was involved as the planner of the project, which was awarded with the State Price for architecture